Australian Flight Data

Adelaide to Guangzhou

China · 50 months of data from Dec 2016 · Guangzhou to Adelaide

Passengers
21,965
Adelaide to Guangzhou, 12 months to Jun 2026
Both directions
44,548
including Guangzhou to Adelaide
Flight time
9h 5m
scheduled, gate to gate
Load factor
83%
seats filled on this leg

Traffic: 12 months to Jun 2026

21,965 passengers flew Adelaide to Guangzhou in the 12 months to Jun 2026, out of 44,548 on the route in both directions. Flights run about 83% full, much the same in both directions.

Passenger history milestones

Recorded milestones use this city-pair passenger series, with both directions combined. A first positive record is not a service-launch date; complete calendar years require all twelve observed, non-null months.

First positive passenger record
Dec 2016
first recorded month with passengers > 0
Latest complete year · also peak
2019
89,707 passengers

The route

Adelaide Guangzhou

Distances are true from Adelaide; the ring marks the distance to Guangzhou.

How long is the flight?

Scheduled flight time from Adelaide to Guangzhou is 9h 5m gate to gate, over 6,985 km. The return leg is scheduled at much the same, 9h.

Scheduled block time — gate to gate, not time in the air — taken from the current timetable for this leg. Long-haul flights are often timetabled differently in each direction because of winds aloft, so the return is not always the same length. Check your own booking for the flight you are taking.

Flight numbers on this route

1 flight number currently scheduled from Adelaide to Guangzhou. These are the numbers you book under.

Not a daily service — this week it is scheduled on Mon and Thu (2 departures).

China Southern · 1 · Boeing 787-9

CZ664

Current timetable as at 2026-09-06

Timetables change, and these carry no punctuality figures of their own — no on-time data is published for international flights at all. The passenger and load factor figures above cover the route, not any single flight number.

Passengers, 2016 to 2026

04,4438,885 Dec 2025Mar 2026Jun 2026
04,4438,885Cyclone Alfred closes south-east Queensland airports — Mar 2025 Dec 2024Sep 2025Jun 2026

Gaps indicate missing observations, not zero values.

06,22712,453Tigerair Australia stops flying — Feb 2020 COVID-19 border closures begin — Mar 2020 The deepest month: domestic traffic falls 96% — Apr 2020 Rex enters the trunk routes with jets — Mar 2021 Delta lockdowns close the eastern states — Jul 2021 Omicron wave hits crew availability — Jan 2022 Bonza launches on leisure routes — Nov 2023 Bonza collapses after 15 months — Mar 2024 Rex enters administration and exits the trunk routes — Aug 2024 Cyclone Alfred closes south-east Queensland airports — Mar 2025 Dec 2016Sep 2021Jun 2026

Gaps indicate missing observations, not zero values.

To Jun 2026 · Marks show industry events

How full were the flights?

Inbound load factor. Every flight on this pair served no other city pair, so the seat count is unambiguous and these figures are exact. Seat data begins in 2009, so this series is shorter than the passenger chart above.

77%85%93% Dec 2025Mar 2026Jun 2026
77%88%99% Dec 2024Sep 2025Jun 2026

Gaps indicate missing observations, not zero values.

65%82%99% Dec 2016Sep 2021Jun 2026

Gaps indicate missing observations, not zero values.

Load factor: seats data from 2009

When is this route busiest?

Average passengers by calendar month over the last ten years, relative to the annual average.

J: 1.36× the annual average J F: 1.25× the annual average F M: 0.80× the annual average M A: 0.96× the annual average A M: 0.79× the annual average M J: 0.78× the annual average J J: 0.90× the annual average J A: 0.91× the annual average A S: 0.92× the annual average S O: 0.98× the annual average O N: 1.15× the annual average N D: 1.21× the annual average D

Freight

Tonnes of air freight carried on this route — a dimension the domestic data does not have at all.

0126252 Dec 2025Mar 2026Jun 2026
0309618 Dec 2024Sep 2025Jun 2026

Gaps indicate missing observations, not zero values.

0309618 Dec 2016Sep 2021Jun 2026

Gaps indicate missing observations, not zero values.

To Jun 2026

The route in numbers

Busiest month on record12,453 · Jan 2019
Data coverageDec 2016 – Jun 2026 (50 months)
Freight, 12 months to Jun 20261,402 tonnes
Destination regionChina

No punctuality data is published for international services, so there are no cancellation or on-time figures on this page. That series covers domestic routes only.